Welcome to the new Erland.com
Check out the latest Muddy Work Boot Read more

Snyder Center at Phillips Academy

Owner: Phillips Academy

Andover, MA

The new Snyder Center at Phillips Academy was built on an extremely sloped site adjacent to the school’s football field that remained in use throughout construction. A soil retention system was used to safeguard against collapse. The new field house includes three basketball courts surrounded by an indoor track, 12 squash courts — 11 regulation and one tournament grade court with viewing deck; and specialty flooring for each purpose. The Snyder Center is the fifth project Erland has done on the Phillips Academy campus and received LEED Platinum certification.

  • Market Academic
  • Architect Perkins + Will
  • Sq Ft 99,000
  • Duration 18 Months
  • Project Type New Construction, Occupied
  • Awards Excellence in Construction Award, Eagle 2018, Associated Builders and Contractors of Massachusetts; Citation for Restraint, 2018, Boston Society of Architects; Build New England, 2019 Performance Award, Associated General Contractors of Massachusetts